Emergency Cooling

COVID-19: Challenges and Responsibilities

In line with government directives in United Arab Emirates on remote working and social distancing, Andrews Sykes climate rental UAE, have begun working remotely from home as precautionary measure to contain the spread of COVID-19.

Praising the governments work from home initiative, Andrews Sykes have implemented the work from home directive since March 25, 2020. Andrews Sykes climate rental are responsible for the health, safety and wellness of their employees. About 90-percentage of sales and administration staff are working from their homes, we are still ensuring that emergency and urgent deliveries can be carried out as safely as possible. read more

Emergency cooling for retail giant prior to grand opening

Andrews Sykes climate rental, UAE was recently contacted by Middle East retail giant in Sharjah, seeking the installation of a temporary cooling equipment in order to keep comfort room temperature at the food section area. The food supplier recommended to maintain comfort room temperature to avoid potential issues that lead to food spoilage.

Seeking a solution on a temporary basis, that was chasing the contractors to complete the chilled water chemical flushing procedures prior to their grand opening of new retail store. Expert from Andrews Sykes recommended 3nos of HPAC30 (30kW) mobile cooling package equipment for the temporary climate control at the food section area.  The solution was not only to cool down the food section but also ensured the workers to remain operational in a comfort workspace. read more

Tube manufacturing firm requires emergency temporary air conditioning

Less frequent service schedule over long periods of time, chilled water system can lose efficiency and become ineffective – this create chances of it breaking down completely. When a well-known tube manufacturing and re-tubing company in Dubai suffered chiller failure at their Jebel Ali depot, an emergency chiller rental was necessary to keep staff and the machineries to work comfortable on site.

Client admitted, their existing unit was very old and less effective, so the eventual breakdown came as no surprise. Therefore, a quick solution was required to ensure their warehouse cooling facility to get restored. The warehouse space was overheating due to the large machineries and heat loads from small sized ovens. read more

Temporary Climate Control of Switchgear Panels for Sewage Treatment Plant in Dubai

The summer in Middle East is so harsh as it is hard to work inside any building which is under construction or renovation, this due to high temperature and humidity. Most of the building contractors look for human comfort inside the building to keep their workers comfortable.

Recently, Andrews Sykes Climate Rental provided two 100kW air cooled chillers and multiples of 50kW air handling equipment to a newly built switchgear and transformer room for a sewage treatment plant located at Jebel Ali district, Dubai. read more

Are you ready for winter? Andrews Sykes Climate Rental Middle East offer a Solution focused on Chiller Maintenance for your Existing Building.

Routine maintenance is an essential part of maximising performance & efficiency from your HVAC equipment. This includes the smallest split system air conditioner to the large multi-chiller plant. A preventive maintenance plan should be carried out each year. With reduced temperatures during the winter months there is no better time to act! Andrews Sykes Chiller Rental offers a carefully managed solution to ensure there are no variations in comfort or ambient temperatures during this major chiller overhaul. Yes, we provide you the temporary chiller during winter 2018-2019 while you carry out the preventive maintenance on your existing chiller. read more

Andrews Sykes Chiller Hire Provide Emergency Cooling for Leading Facilities Management Company in AbuDhabi

Andrews Sykes Climate Rental were contacted by one of Abu Dhabi’s leading facilities management companies who required an emergency cooling solution for their large laundry facility. The project appeared following the breakdown of their permanent chilled water system, which happened during the peak summer and triggered provision to the replacement of faulty chiller.Advanced Laundry

An expert from Andrews Sykes conducted survey and proposed to install two 682kW air cooled chiller along with one VFD driven 660kW air handler and multiple 100kW portable air handler units. Hire team reacted to the emergency fast and provided the proposed chiller within hours of being called. Andrews Sykes also provided a team of expert engineer and technicians, to ensure uninterrupted cooling and reduce the temperature for the entire facility to a comfort zone. read more

Andrews Sykes provides emergency chiller for plastic manufacturing business

Production costs are expenses, such as materials and labor that your company incurs in the course of producing the product that you sell to consumers. However, low production costs do not necessarily guarantee a high quality product to the company. Quality simply means delivering to the customer what they expected-the same guarantee Andrews Sykes always keeps with their customers.

Following the failed restore of 12 year old chiller at a well-established plastic extrusion company located at Ras Al Khaima, UAE, Andrews Sykes, UAE were asked to step in and provide a solution for the intensive plastic extrusion business during peak summer. read more

Andrews Sykes Climate Rental UAE supplied emergency cooling to a high profile Tobacco Company

A high profile tobacco processing company located in Jebel Ali, Dubai, contacted Andrews Sykes Chiller Hire in search of emergency cooling requirement.

During the expert’s site visit it was found that the factory temperatures were reaching above 37 degrees in some areas, the existing chiller which could not cope with the high ambient condition resulted to circuit failure. After thorough assessment(client lacking spare electrical power and does not want to invest more on generator and diesel), it was decided that one 100kW chiller with same capacity air handling unit would provide the necessary amount of cooling to gradually cool down the space. The proposed was quickly installed by our experts and made sure the temperature dropped in 24hr time. read more